Modular construction can cutdown cost between 05% to 20% and shorten construction period substantially i.e. Plant can be brought on line atleast three to five months earlier than conventionally built plant (stick by stick) for a 28 month project.

The major potential benefits of modular construction are:

  • Cost saving
  • Schedule reduction
  • Reduced project risk
  • Improved quality control

Information required for Module Designing:

  • Weight limitations
  • Length, width and height limitations
  • Route traffic restrictions
  • Offloading & erection facilities at site
  • Availability of module storage area at site

For further details/ enquiries please feel free to contact us.